Site
work, stem walls and underground utilities.
|
|
|
|
Bill
Galagher and Professor Scheatzle at site in AUgust 1995. Site cleared
and ready for footings.
|
|
Completed
stem walls - October 1995.
|
 |
 |
| Routing
of buried electrical, water, radiant system supply and return, and
drainage -December 1995. |
Ready for
slab rebar - January 1996. |
 |
Ready
for slab rebar. Stub ups for radiant
system, plumbing and drainage -December 1995. |
[back
to top] |
Placing
the radiant floor tubes and pouring the slab
 |
 |
| Radiant floor tubes
attached to rebar in living room/dining room area - January 1996. |
Pouring the slab, showing
floor manifold for the center zone |
| |
 |
| Slab
pour finished - January 1996 |
|
Adobe
Walls
 |
 |
| Delivery
of adobe blocks-January 1996. |
Start of
adobe walls showing window forms -January 1996 |
| |
|
 |
 |
| Placing
lentils in south wall-January 1996 |
Forming
bond beams on top of adobe walls-February 1996 |
| |
|
|
|
 |
| View of
bond beam from the top-March 1996 |
Framing
above bond beams-March 1996 |
| |
|
Roof
Framing
|
|
 |
| Beginning
the roof framing-March 1996 |
Roof framing
progress looking southwest- 1996 |
| |
|
|
|
 |
Roof framing
showing detail of ridge beam
and rafters- 1996 |
Roof framing
nearing completion- 1996 |
| |
|
Roof/Ceiling Construction
Details
 |
 |
| Section
through roof/ceiling assembly showing various components |
Applying
radiant barrier in rafter air space-January 1997 |
| |
|
 |
 |
| Looking
into rafter air space showing radiant barrier, 2 inch air space below
and 8 inch fiberglass batt insulation- 1997 |
Beginning
to apply Styrofoam board insulation over vapor barrier at bottom of
rafters. This prevents water vapor from the outside from reaching
the cold capillary tubes and condensing.- 1997 |
| |
|
 |
|
| Styrofoam
board insulation over vapor barrier at bottom of rafters. This prevents
water vapor from the outside from reaching the cold capillary tubes
and condensing.- 1997 |
Roof ridge
venting before cap is applied.- 1997 |
| |
|
 |
|
Roof ridge
venting with screen in place before top cap is applied.- 1997
|
|
Exterior
Work
 |
|
| Installing
windows.- 1998 |
|
Interior
Work
|
|
|
| Flagstone
floor completed.- 1998 |
|
|
|
|
Carefree House
Objective
Project Description
Construction Photos
Data
Performance
Animation
Environmental control
Simulation
Conclusions & Observations
Future Work
Acknowledgements
References
Atascadero
|